How to make a Kanban board in Google Sheets

Updated October 9, 2026

Google Sheets has no board view, but you can still run Kanban in it. There are three ways: track a status column in a list, lay the sheet out with one column per stage, or put a real drag-and-drop board on top of your sheet. Here’s how each works and when to use it.

The short answer

MethodBest forDrag and dropSetup
1. A status columnTeams, anything over 20 tasksNo10 minutes
2. A column per stageA quick personal boardSort of (drag cells)5 minutes
3. A board on top of your sheetWhen you want a real board and to keep your data in SheetsYes2 minutes

Method 1: a list with a status column

This is the sturdiest way to keep a Kanban in Sheets. Each task is a row, and its stage is a value in a Status column. It doesn’t look like a board, but it holds as much detail as you want, and you can sort, filter and count it.

  1. Add headers in row 1: Task, Status, Owner, Due date, Notes. Freeze the row with View → Freeze → 1 row.
  2. Make Status a dropdown. Select the Status column (below the header), then Insert → Dropdown. Add your stages, for example To do, Doing, Done, and give each one a color.
  3. Flag what’s late. Select the rows, open Format → Conditional formatting, choose “Custom formula is” and enter =AND($D2<TODAY(), $B2<>"Done"). Pick a red fill. Any task past its due date that isn’t done turns red.
  4. Keep work in progress in check. In a cell beside the list, count each stage with =COUNTIF(B:B, "Doing"). If the Doing count keeps growing, finish things before starting new ones. That limit is the heart of Kanban.
  5. Give everyone their own view. Data → Filter views → Create new filter view, then filter Owner to one person. Each teammate gets a link to their own list without changing anyone else’s.

Where it falls short: it’s still a list. You can’t see the whole flow at a glance, and moving a task means changing a dropdown, not dragging a card.

Method 2: one column per stage

This layout looks most like a board. Each column is a stage and each cell is a card.

  1. Name the columns in row 1: To do, Doing, Done. Widen them to about 250 pixels and turn on text wrapping (Format → Wrapping → Wrap).
  2. Write one task per cell under the stage it’s in. A light fill color per column helps it read like a board.
  3. Move a task by selecting its cell, holding the cell’s border until the cursor turns into a hand, and dragging it into the next column. Cutting and pasting (⌘X / Ctrl+X, then ⌘V / Ctrl+V) works too.

Where it falls short: a cell holds a single line of thought, so there’s nowhere for an owner, a due date or notes. Moving cards leaves gaps, and you can’t sort or filter. It works for a personal to-do board and gets messy with a team.

Method 3: a real board on top of your sheet

If you want drag-and-drop cards without leaving Google Sheets behind, put a board app on top of your spreadsheet. Lanez does exactly that: you work on a Kanban board, and every change is saved to a Google Sheet in your own Drive.

  1. Try it first in the demo, which opens with a sample board and needs no sign-up.
  2. Sign in with Google. Lanez creates a sheet for you, or you pick an existing one.
  3. Bring in your tasks. If you already keep a list like Method 1, Lanez reads that tab and matches its columns (name, status, owner, due date, notes, tags). Each row becomes a card. Your original tab is only read, never changed.
  4. Invite your team. Teammates use the board through Lanez, so they don’t need access to your Google account or the sheet itself.

It costs $24 a year for the whole workspace, and everyone you invite joins free. Because the data lives in your sheet, you can still open it in Sheets, build charts from it, or point ChatGPT or Claude at it.

Which one should you use?

Questions

Does Google Sheets have a Kanban view?

No. Sheets shows grids, charts and pivot tables, but no board of cards. The methods above are the ways around that.

Can I drag and drop in Google Sheets?

You can drag a selected cell or row to a new spot by grabbing its border. That moves content around the grid, but it isn’t the same as dragging cards between stages on a board.

Is a spreadsheet good enough for Kanban?

For the data, yes: a list with a status column holds everything a Kanban board needs. What a spreadsheet lacks is the view. That’s why many people keep the sheet and add a board on top instead of moving to a separate tool.