Project tracker vs Kanban board: which one do you need?

Updated October 9, 2026

A project tracker is a list: one row per project, with columns for status, owner and dates. A Kanban board is a flow: columns for stages, with cards moving across them. A tracker tells you the state of everything; a board shows what’s moving and what’s stuck. Many teams need both, and they can come from the same data.

Side by side

Project trackerKanban board
ShapeRows and columnsCards in stage columns
Answers“What’s the status of everything?”“What’s in progress, and what’s stuck?”
Strong atDetail, sorting, filtering, countingSeeing flow at a glance, limiting work in progress
Changing statusEdit a cell or a dropdownDrag a card to the next column
Weak atShowing bottlenecksHolding lots of detail per item
Typical toolA spreadsheetA board app, or sticky notes on a wall

When a project tracker is the right call

Setting one up takes about 15 minutes: see how to track projects in Google Sheets.

When a Kanban board is the right call

You can approximate one in a spreadsheet: see how to make a Kanban board in Google Sheets.

You don’t have to choose

Look closely and the two hold the same data. A tracker with a Status column already contains a Kanban board: each status is a stage, each row is a card. The only difference is the view.

So the practical answer is to keep the data as a tracker, which is the format every tool, formula and AI assistant can read, and look at it as a board when you need to. That’s what Lanez does: it reads your Google Sheet and shows it as a drag-and-drop Kanban board, and every move on the board is written back to the sheet. Try it in the demo; no sign-up needed.

Questions

Is Kanban only for software teams?

No. It started on factory floors at Toyota, and it works for anything that moves through stages: marketing, hiring, client work, even household chores.

How many columns should a Kanban board have?

Three to five. To do, Doing and Done is a fine start. Add a column only when work genuinely waits there, such as Waiting for review.

Can a project tracker show progress like a board?

Partly. A count per status (=COUNTIF(B:B, "Active")) gives the numbers, and colored status dropdowns help. You still won’t see the flow the way a board shows it.