Project tracker vs Kanban board: which one do you need?
Updated October 9, 2026
A project tracker is a list: one row per project, with columns for status, owner and dates. A Kanban board is a flow: columns for stages, with cards moving across them. A tracker tells you the state of everything; a board shows what’s moving and what’s stuck. Many teams need both, and they can come from the same data.
Side by side
| Project tracker | Kanban board | |
|---|---|---|
| Shape | Rows and columns | Cards in stage columns |
| Answers | “What’s the status of everything?” | “What’s in progress, and what’s stuck?” |
| Strong at | Detail, sorting, filtering, counting | Seeing flow at a glance, limiting work in progress |
| Changing status | Edit a cell or a dropdown | Drag a card to the next column |
| Weak at | Showing bottlenecks | Holding lots of detail per item |
| Typical tool | A spreadsheet | A board app, or sticky notes on a wall |
When a project tracker is the right call
- You report upward. Managers and clients want a list they can scan and sort, often with dates and budgets alongside.
- Projects are long and few change each week. A row per project with a next step is enough; nothing needs to “flow”.
- You need numbers. Counts per status, overdue totals and charts all come easily from rows.
Setting one up takes about 15 minutes: see how to track projects in Google Sheets.
When a Kanban board is the right call
- Work moves through stages every day, like content going from draft to edit to published, or orders from received to shipped.
- Things get stuck and nobody notices. On a board, a pile of cards in one column is impossible to miss.
- You want to limit work in progress. Kanban’s core rule is to finish before you start more. A board makes the count visible: if Doing has eight cards, stop starting.
You can approximate one in a spreadsheet: see how to make a Kanban board in Google Sheets.
You don’t have to choose
Look closely and the two hold the same data. A tracker with a Status column already contains a Kanban board: each status is a stage, each row is a card. The only difference is the view.
So the practical answer is to keep the data as a tracker, which is the format every tool, formula and AI assistant can read, and look at it as a board when you need to. That’s what Lanez does: it reads your Google Sheet and shows it as a drag-and-drop Kanban board, and every move on the board is written back to the sheet. Try it in the demo; no sign-up needed.
Questions
Is Kanban only for software teams?
No. It started on factory floors at Toyota, and it works for anything that moves through stages: marketing, hiring, client work, even household chores.
How many columns should a Kanban board have?
Three to five. To do, Doing and Done is a fine start. Add a column only when work genuinely waits there, such as Waiting for review.
Can a project tracker show progress like a board?
Partly. A count per status (=COUNTIF(B:B, "Active")) gives the numbers, and colored status dropdowns help. You still won’t see the flow the way a board shows it.