How to make a task tracker in Google Sheets
Updated October 9, 2026
A task tracker in Google Sheets needs four things: a checkbox to tick, a due date, a priority, and something that shows how far along you are. Here’s how to build one in about ten minutes, including finished tasks that cross themselves off.
Lay out the columns
Put these headers in row 1 and freeze the row (View → Freeze → 1 row):
| Column | Header | Holds |
|---|---|---|
| A | Done | A checkbox |
| B | Task | What to do, starting with a verb |
| C | Priority | High, Medium or Low |
| D | Due | A date |
| E | Notes | Anything else |
Build it step by step
- Add checkboxes. Select A2 down to about A200, then Insert → Checkbox. A ticked box stores TRUE, an empty one FALSE, which the formulas below rely on.
- Make Priority a dropdown. Select C2:C200, then Insert → Dropdown, add High, Medium and Low, and give them red, yellow and gray. More options are in the dropdown guide.
- Cross off finished tasks. Select A2:E200, open Format → Conditional formatting, choose “Custom formula is” and enter
=$A2=TRUE. Under formatting style, turn on strikethrough and pick a gray text color. Ticking a box now grays out the whole row. - Flag late tasks. Add a second rule on the same range with
=AND($A2=FALSE, $D2<>"", $D2<TODAY())and a red fill. The overdue dates guide explains how it works. - Show your progress. In a cell above or beside the list, enter
=COUNTIF(A2:A200, TRUE)/COUNTA(B2:B200)and format it as a percent (Format → Number → Percent). - Turn it into a bar. In the next cell, enter
=SPARKLINE(COUNTIF(A2:A200, TRUE)/COUNTA(B2:B200), {"charttype","bar";"max",1}). It draws a small progress bar inside the cell.
Two extras worth adding
Finished tasks at the bottom
Turn on Data → Create a filter, then sort the Done column A to Z. Unticked tasks (FALSE) sort above ticked ones (TRUE). Sort by Due next, and the list reads top to bottom in the order you should work through it.
A “Today” tab
Add a tab called Today and put this in A1: =FILTER(Tasks!B2:B, Tasks!A2:A=FALSE, Tasks!D2:D<>"", Tasks!D2:D<=TODAY()). It lists every unfinished task due today or earlier, and updates as you tick things off. Rename your first tab to Tasks, or change the name in the formula.
Checkbox or status dropdown?
Checkboxes are best when a task is either done or not, which is true of most personal to-dos. When tasks pass through stages (to do, in progress, waiting, done), use a status dropdown instead. At that point you’re tracking work in progress, and a Kanban board in Google Sheets may suit you better.
Lanez combines both ideas: each project is a card on a board, and inside it is a short checklist of next actions, all saved in a Google Sheet in your Drive. Its Today view collects the next action from every card. You can try it in the demo.
Questions
How do I share the tracker without letting people break it?
Share it as a commenter or viewer, or protect the formula cells with Data → Protect sheets and ranges. Filter views let people look at their own tasks without changing the sort for everyone else.
Why does my progress count look wrong?
COUNTA counts every non-empty cell in the Task column, including stray spaces. Make sure the range starts at row 2, so the header isn’t counted, and clear any cells that only look empty.